Skip to main content Skip to search Skip to main navigation

Product information "Plastic building site power distribution board 63A (10kA), type 390KS-MH-10, 2xT25, 2xT23, 2xCEE16/5, 2xCEE32/5"

Plastic building site power distributor 390KS-MH-10 63A (10kA)

Our plastic power distribution boards are very practical thanks to their compact and lightweight design. The plastic material is environmentally friendly and resistant to chemicals. Compliance with all current regulations and standards (IEC EN-61439). The distributors can also be configured according to your individual requirements.

Corrosion-free, UV-resistant, oil and acid-resistant, very good chemical resistance, light grey Ral 7035, IP44, completely ready for connection, recorded design certificates and parts certificates in accordance with IEC EN 61439-4

Features of plastic site power distribution board 390KS-MH-10 63A (10kA):

  • With handle
  • Direct wall mounting possible
  • Dimensions (L x W x D): 390 x 300 x 130mm
  • 1 x RCD 63A type A 3PN 30mA
  • 1 x LS 32A C 3P 10kAkA
  • 2 x LS 16A C 3P 10kA
  • 1 x LS 16A C 1P 10kA
  • 2 x socket outlet T25 16A 230/400V IP55
  • 2 x socket outlet T23 16A 230V IP55
  • 3 x socket outlet CEE 16A 5P 400V 6h IP44
  • 2 x socket outlet CEE 32A 5P 400V 6h IP44
  • 1 x 2.5 metre PUR cable 5x10mm2 with CEE 63A 5P 6h 400V plug
  • Preparation for 2x cable gland M25 or M32
  • All socket outlet contacts are nickel-plated

Optionally available:

  • Base frames available for mobile use
Item number: 77302
Characteristic: C
Clock position: 6h
Feed-in: CEE 63A 5P 6h 400V
Frequency: 50 & 60 Hz
Halogen-free: Yes
Number of modules: 14
Number of sockets: 9
Protection class: IP 44, IP55
Rated current: 63A
Rated voltage: 230/400V
Residual current type: A
Short-circuit resistance: 10kA
Socket selection: CEE 16A 5P 6h IP44, CEE 32A 5P 6h IP44, T23 16A IP55, T25 16A IP55
With connection cable: Yes

Contact person

If you have any questions, feel free to contact our representatives.

avatar
DE
Tobias Schneider

Head of Product Development and Consultancy, Management Board

Similar products

On Demand

Shipping

Delivery Time approx. 3-4 Weeks

On Demand

Shipping

Delivery Time approx. 3-4 Weeks

Customers also bought

In Stock
7

Shipping

Delivered on Tuesday

7 Piece Still in Stock

In Procurement

Delivery Time approx. 3-4 Weeks

100 Piece Ordered from Manufacturer

In Stock
77

Shipping

Delivered on Tuesday

77 Piece Still in Stock

External Warehouse

Available Between Fri 18.07 and Fri 18.07

More than 100 Piece Available in External Warehouse

Available Soon

Available Between Wed 09.07 and Wed 09.07

20 Piece Ordered from Manufacturer

In Stock
99+

Shipping

Delivered on Tuesday

More than 1000 Piece in Stock

Clearance
99+

Shipping

Delivered on Tuesday

More than 100 Piece in Stock

While Supplies Last

This item is being cleared out and will not be restocked.

Customers also viewed

On Demand

Shipping

Delivery Time approx. 3-4 Weeks

On Demand

Shipping

Delivery Time approx. 3-4 Weeks